1) Mechanical and Electrical Equipment: including processing equipment, construction machinery, semiconductor equipment, printing equipment, textile equipment, etc.
2) Pre-packaged Bulk Food: such as pre-packaged food, nuts, dairy products, edible oils, various wines, mineral water, honey, etc.
3)Cosmetics & Personal CareAnd Daily Necessities: including masks, nucleic acid test reagents, cosmetics, clothing, shoes and hats, mattresses, pillows, kitchenware, etc.
4) Handling various documents: such as mechanical and electrical certificates, out-of-catalogue, exemption3C, energy efficiency appraisal, certificate of origin, export commodity inspection, etc.
5) Various General Goods: including second-hand luxury goods, watches, bags, furniture, lamps, electronic components, ores, marble, etc.
1) Sign a contract and pay foreign exchange.
2) Prepare customs clearance materials in advance.
3) Review customs clearance materials.
4) Print the bill and confirm the draft.
5) Send the declaration.
6) Issue tax.
7) Pay tax.
8) Inspection.
9) Release.
10) Deliver goods.
1) General goods and bulk general goods: generally require 1 - 2 working days.
2) Food or cosmetics: The first import is expected to take 5 - 10 working days, and subsequent imports can be completed within a week.
© 2025. All Rights Reserved.沪ICP备2023007705号-2PSB Record: Shanghai No.31011502009912